These are the planned roadworks taking place in Herefordshire in November, according to Ledbury Town Council.
HIGHWAY AND FOOTWAY SURFACING AND PATCHING WORKS – ROAD CLOSURES
Resurfacing or patching works (including white lining and stud works, if required) as well as any preparatory works (i.e. drainage, kerbing) if required.
Golden Post, Hereford
Road closed from Thursday 17th October to (and including) Thursday 2nd November, between 8am and 4:30pm each day.
Footway resurfacing works.
C1108 Village Street, Wellington
Road closed from Monday 30th October to (and including) Friday 3rd November, between 9am and 5pm each day.
Resurfacing works.
C1125 Bodenham
Road closed from Monday 30th October to (and including) Tuesday 7th November, between 9am and 5pm each day.
Patching works.
C1205 Michaelchurch Escley
Road closed from Monday 30th October to (and including) Friday 10th November, between 9am and 5pm each day.
Patching works.
C1294 Kynaston
Road closed from Monday 6th November to (and including) Thursday 9th November, between 9am and 5pm each day.
Patching works.
Ivington Road, Ryelands
Road closed from Friday 10th November to (and including) Thursday 16th November, between 9am and 5pm each day.
Patching works.
C1154 Canon Frome
Road closed from Thursday 9th November to (and including) Friday 17th November, between 9am and 5pm each day.
Patching works.
C1082 Bearwood
Road closed from Thursday 16th November to (and including) Friday 24th November, between 9am and 5pm each day.
Patching works.
C1110 Pencombe
Road closed from Thursday 23rd November to (and including) Friday 8th December, between 8am and 4pm each day.
Patching works.
B4360 Kingsland
Road closed from Monday 20th November to (and including) Thursday 23rd November, between 9am and 5pm each day.
Resurfacing works.
DRAINAGE WORKS – ROAD CLOSURES
Improvements or repairs to the local drainage system. May involve excavation of the carriageway.
Sharman Pitch, Howle Hill
Road closed from Monday 27th November to (and including) Friday 1st December, between 8am and 5pm each day.
Drainage works
BRIDGE WORKS
Eye Lane, Luston
Road closed from Monday 11th September to (and including) Friday 3rd November.
Road closed for 24 hours each day.
Bridge strengthening works.
Comberton Bridge, Kings Road, Orleton
Road closed from Monday 2nd October to (and including) Friday 24th November.
Road closed for 24 hours each day.
Bridge strengthening works.
Wyatt Road, Cross Keys
Road closed from Monday 2nd October to (and including) Friday 24th November.
Road closed for 24 hours each day.
Bridge strengthening works.
MISCELLANEOUS ROAD CLOSURES, EMERGENCY CLOSURES & OTHER PROJECTS
Hinton Lane, Norton Canon
Road closed from Thursday 23rd November to (and including) Tuesday 28th November, between 8:30am and 4:30pm each day.
Signage replacement.
Bridge Street, Kington
Road closed from Monday 27th November for four nights, between 6pm and 2am each night.
Block paving works.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules hereLast Updated:
Report this comment Cancel